Industrial Projects

Prime Woods plant expansion
Design-build cabinet manufacturing plant expansion – Moorefield, WV

Federal Express
65,000 square foot package distribution center – Winchester, VA

Interbake Foods
15,000 square foot cookie baking facility – Front Royal, VA

Collision Repair Facility
10,000 square foot, two-story facility for Jim Stutzman Chevrolet automotive body repair – Winchester, VA

Shenandoah University Maintenance Facility
20,000 square foot maintenance facility and physical plant offices – Winchester, VA

Rubbermaid Materials and Chemistry Laboratories
Conversion of general plant area into fuctional labs; includes acid neutralization systems, fume hoods, and precise climate control – Winchester, VA

Rubbermaid Development lab Alterations
Alteration of existing plant to provide product testing facilities. Includes environmentally controlled test chambers – Winchester, VA

experience menu